" />
Availability: | |
---|---|
With the use of four-pump hydraulic system, 20Ton Horizontal Directional Drilling Machine has better working efficiency and rational power distribution. Its forced air cooling system enables it to work reliably for a long time. Additionally, its impact structure and sound climbing capacity can make transfer and transportation of the equipment more convenient. High-speed operation system has multi-shift stepless speed regulation function, significantly increasing the operation efficiency.
Technical parameter:
Engine power | KW | 110/2200 |
| mm | 6400x2050x2350 |
Max thrust force | KN | 200 | Weight | T |
|
Max pullback force | KN | 200 | Dia.of drilling rod | mm | φ60 |
Max torque | N.m | 5900 | Length of drilling rod | m | 3 |
Max rotary speed | rpm | 180 | Max Dia.of pullback pipe | mm | φ150~φ700 |
Max carriage speed | m/min | 30 | Max construction length | m | ~300 |
Max mud pump flow | L/min | 240 | Incidence Angle | · | 10~22 |
Max mud pressure | Mpa | 7±0.5 | Climbing angle | · | 14 |
Stages of the 20Ton Horizontal Directional Drilling Machine works:
Stage 1 is a preparation step. At this stage it’s necessary to analyze the soil composition, existed underground utilities and other materials. Also at 1st stage is very important to prepare and sign all technical documents for the construction project.
Stage 2 is a pilot boring The pilot hole is drilled from the entry point to the exit point following a previously designed profile and alignment. The drilling tools and rig equipment selected for each job is largely determined based on the results of the geotechnical investigation and the size of the crossing (length and diameter). During the pilot hole drilling, a directional guidance system is used to navigate the pilot hole along its pre-designed profile
Stage 3 is reaming the hole. Hole enlargementIn small diameter crossings the pipeline may be directly installed in the pilot hole. However in most cases pilot hole enlarging, known as “pre-reaming,” will be necessary. Pre-reaming is required to provide a bore diameter large enough so that the pipeline can be installed in the drilled crossing. Based on the final desired diameter and soil conditions this process may include one or more stages.
Stage 4 is Pull back. Once the drilled hole has been enlarged to the required diameter and cleaned adequately, the pipeline is installed. It is final stage of drilling works. The pipeline is dragged into the built horizontal well (borehole). After completing of drilling works, as-built documentation is given to the customer. It is important to choose a suitable drilling rig for carrying out the drilling works of high quality
With the use of four-pump hydraulic system, 20Ton Horizontal Directional Drilling Machine has better working efficiency and rational power distribution. Its forced air cooling system enables it to work reliably for a long time. Additionally, its impact structure and sound climbing capacity can make transfer and transportation of the equipment more convenient. High-speed operation system has multi-shift stepless speed regulation function, significantly increasing the operation efficiency.
Technical parameter:
Engine power | KW | 110/2200 |
| mm | 6400x2050x2350 |
Max thrust force | KN | 200 | Weight | T |
|
Max pullback force | KN | 200 | Dia.of drilling rod | mm | φ60 |
Max torque | N.m | 5900 | Length of drilling rod | m | 3 |
Max rotary speed | rpm | 180 | Max Dia.of pullback pipe | mm | φ150~φ700 |
Max carriage speed | m/min | 30 | Max construction length | m | ~300 |
Max mud pump flow | L/min | 240 | Incidence Angle | · | 10~22 |
Max mud pressure | Mpa | 7±0.5 | Climbing angle | · | 14 |
Stages of the 20Ton Horizontal Directional Drilling Machine works:
Stage 1 is a preparation step. At this stage it’s necessary to analyze the soil composition, existed underground utilities and other materials. Also at 1st stage is very important to prepare and sign all technical documents for the construction project.
Stage 2 is a pilot boring The pilot hole is drilled from the entry point to the exit point following a previously designed profile and alignment. The drilling tools and rig equipment selected for each job is largely determined based on the results of the geotechnical investigation and the size of the crossing (length and diameter). During the pilot hole drilling, a directional guidance system is used to navigate the pilot hole along its pre-designed profile
Stage 3 is reaming the hole. Hole enlargementIn small diameter crossings the pipeline may be directly installed in the pilot hole. However in most cases pilot hole enlarging, known as “pre-reaming,” will be necessary. Pre-reaming is required to provide a bore diameter large enough so that the pipeline can be installed in the drilled crossing. Based on the final desired diameter and soil conditions this process may include one or more stages.
Stage 4 is Pull back. Once the drilled hole has been enlarged to the required diameter and cleaned adequately, the pipeline is installed. It is final stage of drilling works. The pipeline is dragged into the built horizontal well (borehole). After completing of drilling works, as-built documentation is given to the customer. It is important to choose a suitable drilling rig for carrying out the drilling works of high quality
DL200 | 1 |
Drill head φ60mm | 1 |
Drill rod φ60*3000mm | 100 |
Barrel reamer φ200mm | 1 |
Barrel reamer φ300mm | 1 |
Barrel reamer φ400mm | 1 |
Barrel reamer φ500mm | 1 |
Barrel reamer φ600mm | 1 |
Power divider/Swivel 20T | 1 |
Protection joint/Sub saver | 1 |
Extension rod | 1 |
Left-handed nut | 1 |
Extension rod octagonal/ Torque sleeve | 1 |
Male-female connector/Pull eye | 1 |
Clamp slip | 8 |
DL200 | 1 |
Drill head φ60mm | 1 |
Drill rod φ60*3000mm | 100 |
Barrel reamer φ200mm | 1 |
Barrel reamer φ300mm | 1 |
Barrel reamer φ400mm | 1 |
Barrel reamer φ500mm | 1 |
Barrel reamer φ600mm | 1 |
Power divider/Swivel 20T | 1 |
Protection joint/Sub saver | 1 |
Extension rod | 1 |
Left-handed nut | 1 |
Extension rod octagonal/ Torque sleeve | 1 |
Male-female connector/Pull eye | 1 |
Clamp slip | 8 |