Availability: | |
---|---|
DFM1504B drill is of separated structure, composed of main body and power station, and is characterized by flexible arrangement and easy operation in a narrow space or pit. By the patented holder, the angle of incidence may be adjusted and the jig can move back and forth.
Technical parameter:
Engine power | KW | 26.5/2350 |
| mm | 1295x960x1100 -(holder inclusive) 1180x470x970 -(holder exclusive) |
Max thrust force | KN | 70 | Weight | T | 1.4 |
Max pullback force | KN | 50 | Dia.of drilling rod | mm | φ50 |
Max torque | N.M | 1300 | Length of drilling rod | m | 0.5 |
Max rotary speed | rpm | 100 | Max Dia.of pullback pipe | mm | φ150~φ300 |
Max carriage speed | m/min | 14.5 | Max construction length | m | ~80 |
Max mud pump flow | L/min | 40 | Incidence Angle | · | 0~10 |
Max mud pressure | Mpa | 3±0.5 | Climbing angle | · |
Stages of the HDD-machine works:
Stage 1 is a preparation step. At this stage it’s necessary to analyze the soil composition, existed underground utilities and other materials. Also at 1st stage is very important to prepare and sign all technical documents for the construction project.
Stage 2 is a pilot boring The pilot hole is drilled from the entry point to the exit point following a previously designed profile and alignment. The drilling tools and rig equipment selected for each job is largely determined based on the results of the geotechnical investigation and the size of the crossing (length and diameter). During the pilot hole drilling, a directional guidance system is used to navigate the pilot hole along its pre-designed profile
Stage 3 is reaming the hole. Hole enlargementIn small diameter crossings the pipeline may be directly installed in the pilot hole. However in most cases pilot hole enlarging, known as “pre-reaming,” will be necessary. Pre-reaming is required to provide a bore diameter large enough so that the pipeline can be installed in the drilled crossing. Based on the final desired diameter and soil conditions this process may include one or more stages.
Stage 4 is Pull back. Once the drilled hole has been enlarged to the required diameter and cleaned adequately, the pipeline is installed. It is final stage of drilling works. The pipeline is dragged into the built horizontal well (borehole). After completing of drilling works, as-built documentation is given to the customer. It is important to choose a suitable drilling rig for carrying out the drilling works of high quality
DFM1504B drill is of separated structure, composed of main body and power station, and is characterized by flexible arrangement and easy operation in a narrow space or pit. By the patented holder, the angle of incidence may be adjusted and the jig can move back and forth.
Technical parameter:
Engine power | KW | 26.5/2350 |
| mm | 1295x960x1100 -(holder inclusive) 1180x470x970 -(holder exclusive) |
Max thrust force | KN | 70 | Weight | T | 1.4 |
Max pullback force | KN | 50 | Dia.of drilling rod | mm | φ50 |
Max torque | N.M | 1300 | Length of drilling rod | m | 0.5 |
Max rotary speed | rpm | 100 | Max Dia.of pullback pipe | mm | φ150~φ300 |
Max carriage speed | m/min | 14.5 | Max construction length | m | ~80 |
Max mud pump flow | L/min | 40 | Incidence Angle | · | 0~10 |
Max mud pressure | Mpa | 3±0.5 | Climbing angle | · |
Stages of the HDD-machine works:
Stage 1 is a preparation step. At this stage it’s necessary to analyze the soil composition, existed underground utilities and other materials. Also at 1st stage is very important to prepare and sign all technical documents for the construction project.
Stage 2 is a pilot boring The pilot hole is drilled from the entry point to the exit point following a previously designed profile and alignment. The drilling tools and rig equipment selected for each job is largely determined based on the results of the geotechnical investigation and the size of the crossing (length and diameter). During the pilot hole drilling, a directional guidance system is used to navigate the pilot hole along its pre-designed profile
Stage 3 is reaming the hole. Hole enlargementIn small diameter crossings the pipeline may be directly installed in the pilot hole. However in most cases pilot hole enlarging, known as “pre-reaming,” will be necessary. Pre-reaming is required to provide a bore diameter large enough so that the pipeline can be installed in the drilled crossing. Based on the final desired diameter and soil conditions this process may include one or more stages.
Stage 4 is Pull back. Once the drilled hole has been enlarged to the required diameter and cleaned adequately, the pipeline is installed. It is final stage of drilling works. The pipeline is dragged into the built horizontal well (borehole). After completing of drilling works, as-built documentation is given to the customer. It is important to choose a suitable drilling rig for carrying out the drilling works of high quality
DFM1504B | 1 |
Drill head φ50mm | 1 |
Drill rod, φ50*500mm | 100 |
Barrel reamer φ200mm | 1 |
Barrel reamer φ300mm | 1 |
Power divider/Swivel 10T | 1 |
Plug 2 Inch | 1 |
Male-female connector/Pull eye | 1 |
Clamp slip | 8 |
DFM1504B | 1 |
Drill head φ50mm | 1 |
Drill rod, φ50*500mm | 100 |
Barrel reamer φ200mm | 1 |
Barrel reamer φ300mm | 1 |
Power divider/Swivel 10T | 1 |
Plug 2 Inch | 1 |
Male-female connector/Pull eye | 1 |
Clamp slip | 8 |